View Details

Return to the Bids Homepage

Bid Classification: 
Construction
Bid Type:  RFQ
Bid Number:  21-095
Bid Name:  Construction Services for the Lulu Island Wastewater Treatment Plant Industrial Control Systems Input/Output Upgrade Projects
Bid Status:  Awarded
Bid Awarded Date:  Fri Jun 18, 2021 (PDT)
Bid Closing Date:  Tue May 4, 2021 2:00:00 PM (PDT)
Question Deadline:  Tue Apr 27, 2021 12:00:00 PM (PDT)
Time-frame for delivery or the duration of the contract:  Refer to project document
Negotiation Type:  Refer to project document
Condition for Participation:  Refer to project document
Electronic Auctions:  Not Applicable
Language for Bid Submissions:  English unless specified in the bid document
Submission Type:  Online Submissions Only
Submission Address:  Online Submissions Only
Public Opening:  No
Description: 

The following represents a summary of the anticipated scope for the construction: 1.Provision, installation and commissioning of new Gateway (GWY) Control Panels. 2. Installation and commissioning of Corporation supplied MPX Control Panels. 3. Provision of 120VAC power supply wiring for the new control panels. 4. Provision of new Ethernet CAT6 wiring for the existing Motor Control Centers (MCC) and MPX Control Panels. 5. Demolition of the existing ABB INFI90 CAB Control Panels. 6. Demolition of existing MPC, MPD and MPA INFI90 I/O Marshaling Panels. 7. Retrofit of the existing MCC installed Mitsubishi VFDs to Modbus TCP controls. 8. Retrofit of the existing hardwired MCC FVNR motor starters to Intelligent Smart Overloads over Modbus TCP. 9. Rewiring of the existing hardwired MCC FVNR motor starters to new MPX ABB S800 & Select IO based Control Panels. 10. Removal of control and analog wiring between the MCC and MPX control panels which is not required. 11. Rewiring of the existing control and analog cables from the existing MPC, MPD and MPA control panels to MPX control panels. 12. Provision of new single mode fiber patch cords c/w flexible tubing. 13. Installation and termination of new single mode fiber wiring. 14. Coordination with Corporation for all necessary equipment shutdowns. 15. Attending coordination and construction meetings with the Corporation and Consulting Engineer personnel. 16. Removal and disposal of the existing MPA, MPC, MPA and CAB control panels. 17. Provide all labeling for cables, wires and other equipment as per Corporation’s standards. 18. Prepare and submit submittals for approval by the Corporation and the Corporation’s Consulting Engineer for all cables, GWY Control Panels, motor starters, smart overloads, MCCs and other equipment prior to procurement. 19. Submit all required documentation for the closure of the Project as required by the Corporation.

Bid Document Access:  Bid Opportunity notices and awards and a free preview of the bid documents is available on this site free of charge without registration. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. There is no cost to obtain an unsecured version of the document and /or to participate in this solicitation.
Trade Agreement Description:  Show Trade Agreement Description [+]
CETA
CFTA
NWPTA
Categories:  Show Categories [+]
  • Building Operation Supplies and Equipment - ONLY
    • Electrical
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.

Awarded

The following are the awarded vendors for the bid:

​No Awarded Vendors

Bids Submitted

The following are the unofficial bid results

No submitted bids

Plan Takers

The following are the registered plan takers for the bid:

There are no plan takers for this bid.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.